Botswana Power Corporation - Francistown
Botswana Power Corporation
2.0
1 Review
Botswana Power CorporationHaskins St, Central, P.O.Box 815+267 241 6995https://www.localbotswana.com/img/bw/k/_1610552776-21-botswana-power-corporation.jpg
- Verified
Listing
Company name
Botswana Power Corporation
Location
Haskins St, Central, P.O.Box 815, Francistown, Botswana
Contact number
Fax
+267 241 6995
+267 241 4534
+267 241 4534
Website address
Working hours
- Monday: 08:00 - 17:30
- Tuesday: 08:00 - 17:30
- Wednesday: 08:00 - 17:30
- Thursday: 08:00 - 17:30
- Friday: 08:00 - 17:30
- Saturday: 08:00 - 12:00
- Sunday: 09:00 - 17:00
E-mail address
Company description
Botswana Power Corporation, a parastatal utility which was formed in 1970 by an Act of Parliament is responsible for the generation, transmission and distribution of electricity within Botswana to areas approved by the Ministry of Minerals Resources, Green Technology and Energy Security.
The Corporation, within the forty-eight years of its existence, has developed from a small, oil-fired power station in Gaborone which was commissioned in 1970 and dismantled in 1989 to one Thermal Power Station at Morupule situated some twelve kilometres west of Palapye village in the Central District. The Power station is supplied with coal from adjacent Morupule Colliery.
Morupule power station was commissioned in two stages with the latest generator being commissioned in March 1989.The power
In 1975 the Government initiated the Rural Electrification Program with assistance from the Swedish International Development Agency (SIDA). Management of the project fell under the Government’s newly created Rural Agency, with Botswana Power Corporation (BPC) as the implementation agency. The project involved the connection of 11 villages to the national grid among which were Kanye, Molepolole, Ramotswa, Mochudi and others. This project was completed in 1993.
In 1987 another project to provide power supplies to the major villages of Serowe, Palapye, and Mahalapye was implemented with financial assistance from the Danish International Development Agency (DANIDA). Other rural electrification projects including the connection of Shoshong, Bobonong, Sefhophe and Tuli Block farms were also undertaken with the assistance from DANIDA. Thereafter the Government availed funds to provide electricity to the villages of Masunga, Tutume, Shakawe and Mohembo. Funds were further made available from both the Government and the Botswana Power Corporation for the provision of electricity to the villages of Oodi, Modipane, Pitsane, Goodhope, Sikwane and the river villages, Mmankgodi, Manyana, Rasesa, Morwa, Pilane, Mmopane, Radisele, Tati-Siding, Kumakwane, Letlhakeng and Serule. Maun was connected to the national grid at the end of 1994. In 1995 the Government continued its drive to expand the provision of electricity to rural areas by electrifying the villages of Bray, Makopong, Lerala, Moeng, Ratholo, Nata, Tsabong, Tshesebe and Tsamaya.
The Corporation, within the forty-eight years of its existence, has developed from a small, oil-fired power station in Gaborone which was commissioned in 1970 and dismantled in 1989 to one Thermal Power Station at Morupule situated some twelve kilometres west of Palapye village in the Central District. The Power station is supplied with coal from adjacent Morupule Colliery.
Morupule power station was commissioned in two stages with the latest generator being commissioned in March 1989.The power
Show more
station employs high technological control systems and operates on the dry cooling method thereby conserving water resources. Morupule Power Station provides approximately 20% of the country's power requirement Before commissioning of Morupule Power Station in 1989 the Corporation generated electricity from the Selebi Phikwe power station which was commissioned in 1974 and was decommissioned in 1989.In 1975 the Government initiated the Rural Electrification Program with assistance from the Swedish International Development Agency (SIDA). Management of the project fell under the Government’s newly created Rural Agency, with Botswana Power Corporation (BPC) as the implementation agency. The project involved the connection of 11 villages to the national grid among which were Kanye, Molepolole, Ramotswa, Mochudi and others. This project was completed in 1993.
In 1987 another project to provide power supplies to the major villages of Serowe, Palapye, and Mahalapye was implemented with financial assistance from the Danish International Development Agency (DANIDA). Other rural electrification projects including the connection of Shoshong, Bobonong, Sefhophe and Tuli Block farms were also undertaken with the assistance from DANIDA. Thereafter the Government availed funds to provide electricity to the villages of Masunga, Tutume, Shakawe and Mohembo. Funds were further made available from both the Government and the Botswana Power Corporation for the provision of electricity to the villages of Oodi, Modipane, Pitsane, Goodhope, Sikwane and the river villages, Mmankgodi, Manyana, Rasesa, Morwa, Pilane, Mmopane, Radisele, Tati-Siding, Kumakwane, Letlhakeng and Serule. Maun was connected to the national grid at the end of 1994. In 1995 the Government continued its drive to expand the provision of electricity to rural areas by electrifying the villages of Bray, Makopong, Lerala, Moeng, Ratholo, Nata, Tsabong, Tshesebe and Tsamaya.
Location map
Expand Map
Listed in categories
Reviews
2.0
Botswana Power CorporationHaskins St, Central, P.O.Box 815+267 241 6995https://www.localbotswana.com/img/bw/k/_1610552776-21-botswana-power-corporation.jpg
1
My name is Hendry Wright .My home is in Matshelagabedi .I have paid cach for conection of power two and a half monts have passed know if my wife go there and ask them when are you coming to fix for instolation they tell her look at your paper it says three monts now i dont know if it is before three monts or after three monts because if this is going to be after three monts i will have to come over there and here what is the story
Questions & Answers
How much is the deposit for electricity,first time connection?the location is Mathangwane Village
How much is the deposit for electricity,first time connection?the location is tatisiding
Verified Business
The accuracy of the company profile for Botswana Power Corporation is validated by the company owner, representative, or directory administrator.
Last update on
Registered with us on
Last update on
Registered with us on