Botswana Power Corporation BPC - Mochudi
Botswana Power Corporation BPC
1.01 Review
- Verified
Listing
Company name
Botswana Power Corporation BPC
Location
Pilane Ind Sites, P.O.Box 91, Mochudi, Botswana
Contact number
Mobile phone
Fax
+267 572 8202
Website address
Working hours
- Monday: 08:00 - 17:00
- Tuesday: 08:00 - 17:00
- Wednesday: 08:00 - 17:00
- Thursday: 08:00 - 17:00
- Friday: 08:00 - 17:00
- Saturday: Closed
- Sunday: Closed
E-mail address
Company description
Botswana Power Corporation, a parastatal utility which was formed in 1970 by an Act of Parliament is responsible for the generation, transmission and distribution of electricity within Botswana to areas approved by the Ministry of Minerals Resources, Green Technology and Energy Security.
The Corporation, within the forty-eight years of its existence, has developed from a small, oil-fired power station in Gaborone which was commissioned in 1970 and dismantled in 1989 to one Thermal Power Station at Morupule situated some twelve kilometres west of Palapye village in the Central District. The Power station is supplied with coal from adjacent Morupule Colliery.
Morupule power station was commissioned in two stages with the latest generator being commissioned in March 1989.The power
In 1975 the Government initiated the Rural Electrification Program with assistance from the Swedish International Development Agency (SIDA). Management of the project fell under the Government’s newly created Rural Agency, with Botswana Power Corporation (BPC) as the implementation agency. The project involved the connection of 11 villages to the national grid among which were Kanye, Molepolole, Ramotswa, Mochudi and others. This project was completed in 1993.
In 1987 another project to provide power supplies to the major villages of Serowe, Palapye, and Mahalapye was implemented with financial assistance from the Danish International Development Agency (DANIDA). Other rural electrification projects including the connection of Shoshong, Bobonong, Sefhophe and Tuli Block farms were also undertaken with the assistance from DANIDA. Thereafter the Government availed funds to provide electricity to the villages of Masunga, Tutume, Shakawe and Mohembo. Funds were further made available from both the Government and the Botswana Power Corporation for the provision of electricity to the villages of Oodi, Modipane, Pitsane, Goodhope, Sikwane and the river villages, Mmankgodi, Manyana, Rasesa, Morwa, Pilane, Mmopane, Radisele, Tati-Siding, Kumakwane, Letlhakeng and Serule. Maun was connected to the national grid at the end of 1994. In 1995 the Government continued its drive to expand the provision of electricity to rural areas by electrifying the villages of Bray, Makopong, Lerala, Moeng, Ratholo, Nata, Tsabong, Tshesebe and Tsamaya.
During 1996/97 Kgagodi, Mogapi, Mogapinyana, Machaneng, Sefhare, Molapowabojang, Digawana, Lentsweletau and Mmathethe were connected to the national grid. The Government and BPC financed these projects in a 50/50 ratio.
For the financial year 1997/98 the villages of Charles Hill, Mamuno, Ditshegwane, Dukwi, Malotwane, Matebeleng, Matsiloje, Pandamatenga, Phitsane-Molopo, Mathangwane, Sebina, Jackalas No.1, Makaleng and Ranaka were electrified. The cost of electrifying these villages was also divided equally between the Government and BPC.
As the Government’s efforts continued, 1998/99 saw the connection of an additional 14 villages to the national grid with the following being picked up: Borotsi Chadibe, Majwaneng, Maunatlala, Mokobeng, Diloro, Palla-Road, Artesia, Middle-Pits, Sesung, Mapoka, Ramokgwebana, Lotlhakane and Moshaneng. Funding for the villages was shared between the Botswana Government and Botswana Power Corporation.
The Rural Electrification Programme was accelerated with the connection of 72 villages over the period September 1999 to December 2001. The following villages were connected with 100% funding by the Government: Matlapaneng, Mmandunyane, Marobela, Mabeleapudi, Maubelo, Bogogobo, Khuis, Mogorosi, Themashanga, Shorobe, Ramatlabama, Moroka, Nlaphwane, Mosojane, Shashe Mooke, Siviya, Kgomokasitwa, Magotlhwane, Ntlhantlhe, Lekgolobotlo, Sedibeng, Gathwane, Senyawe, Thabala, Kavimba, Mabele, Lesoma, Senete, Nkange, Maitengwe, Nswazwi, Sekakangwe, D’ Kar, Ncojane, Tsootsha, Tamasane, Omawenneno, Khakhea, Marapong, Mosetse, Gootau, Tobane, Sojwe, Mookane, Toteng, Sehitwa, Tsao, Gweta, Xhumo, Rakops, Khudumelapye, Salajwe, Takatokwane, Mmashoro, Kalamare, Moiyabana, Etsha 6, Nokaneng, Tshane, Lokgwabe, Lehututu, Hukuntsi, Mabule, Molalatau, Gobojango, Semolale, Gumare, Mathathane, Mabutsane, Kang, Kachikau and Kolonkwaneng.
The Corporation, within the forty-eight years of its existence, has developed from a small, oil-fired power station in Gaborone which was commissioned in 1970 and dismantled in 1989 to one Thermal Power Station at Morupule situated some twelve kilometres west of Palapye village in the Central District. The Power station is supplied with coal from adjacent Morupule Colliery.
Morupule power station was commissioned in two stages with the latest generator being commissioned in March 1989.The power
Show more
station employs high technological control systems and operates on the dry cooling method thereby conserving water resources. Morupule Power Station provides approximately 20% of the country's power requirement Before commissioning of Morupule Power Station in 1989 the Corporation generated electricity from the Selebi Phikwe power station which was commissioned in 1974 and was decommissioned in 1989.In 1975 the Government initiated the Rural Electrification Program with assistance from the Swedish International Development Agency (SIDA). Management of the project fell under the Government’s newly created Rural Agency, with Botswana Power Corporation (BPC) as the implementation agency. The project involved the connection of 11 villages to the national grid among which were Kanye, Molepolole, Ramotswa, Mochudi and others. This project was completed in 1993.
In 1987 another project to provide power supplies to the major villages of Serowe, Palapye, and Mahalapye was implemented with financial assistance from the Danish International Development Agency (DANIDA). Other rural electrification projects including the connection of Shoshong, Bobonong, Sefhophe and Tuli Block farms were also undertaken with the assistance from DANIDA. Thereafter the Government availed funds to provide electricity to the villages of Masunga, Tutume, Shakawe and Mohembo. Funds were further made available from both the Government and the Botswana Power Corporation for the provision of electricity to the villages of Oodi, Modipane, Pitsane, Goodhope, Sikwane and the river villages, Mmankgodi, Manyana, Rasesa, Morwa, Pilane, Mmopane, Radisele, Tati-Siding, Kumakwane, Letlhakeng and Serule. Maun was connected to the national grid at the end of 1994. In 1995 the Government continued its drive to expand the provision of electricity to rural areas by electrifying the villages of Bray, Makopong, Lerala, Moeng, Ratholo, Nata, Tsabong, Tshesebe and Tsamaya.
During 1996/97 Kgagodi, Mogapi, Mogapinyana, Machaneng, Sefhare, Molapowabojang, Digawana, Lentsweletau and Mmathethe were connected to the national grid. The Government and BPC financed these projects in a 50/50 ratio.
For the financial year 1997/98 the villages of Charles Hill, Mamuno, Ditshegwane, Dukwi, Malotwane, Matebeleng, Matsiloje, Pandamatenga, Phitsane-Molopo, Mathangwane, Sebina, Jackalas No.1, Makaleng and Ranaka were electrified. The cost of electrifying these villages was also divided equally between the Government and BPC.
As the Government’s efforts continued, 1998/99 saw the connection of an additional 14 villages to the national grid with the following being picked up: Borotsi Chadibe, Majwaneng, Maunatlala, Mokobeng, Diloro, Palla-Road, Artesia, Middle-Pits, Sesung, Mapoka, Ramokgwebana, Lotlhakane and Moshaneng. Funding for the villages was shared between the Botswana Government and Botswana Power Corporation.
The Rural Electrification Programme was accelerated with the connection of 72 villages over the period September 1999 to December 2001. The following villages were connected with 100% funding by the Government: Matlapaneng, Mmandunyane, Marobela, Mabeleapudi, Maubelo, Bogogobo, Khuis, Mogorosi, Themashanga, Shorobe, Ramatlabama, Moroka, Nlaphwane, Mosojane, Shashe Mooke, Siviya, Kgomokasitwa, Magotlhwane, Ntlhantlhe, Lekgolobotlo, Sedibeng, Gathwane, Senyawe, Thabala, Kavimba, Mabele, Lesoma, Senete, Nkange, Maitengwe, Nswazwi, Sekakangwe, D’ Kar, Ncojane, Tsootsha, Tamasane, Omawenneno, Khakhea, Marapong, Mosetse, Gootau, Tobane, Sojwe, Mookane, Toteng, Sehitwa, Tsao, Gweta, Xhumo, Rakops, Khudumelapye, Salajwe, Takatokwane, Mmashoro, Kalamare, Moiyabana, Etsha 6, Nokaneng, Tshane, Lokgwabe, Lehututu, Hukuntsi, Mabule, Molalatau, Gobojango, Semolale, Gumare, Mathathane, Mabutsane, Kang, Kachikau and Kolonkwaneng.
Listed in categories
Reviews
1.0
Botswana Power Corporation BPCPilane Ind Sites, P.O.Box 91+267 572 9288https://www.localbotswana.com/img/bw/r/_1610653901-17-botswana-power-corporation-bpc.jpg
1
rasesa black out
muchudi BPC you messing up my appliances. there is never a week that goes by without a power balck out. what ever the issue is it needs to identified and sorted out. i have been living in rasesa for a year now and if these black outs have been the norm i feel sorry for those who have been living there longer than i. please on bended knees can you stop the black out. be it its windy, raining, sunny or otherwise, always there is a black out. what is the issue and why is it not being fixed.
Questions & Answers
Hellow Mochudi Bpc i logged a call yesterday ka motlakase oo timileng even ga ke ise ke thusiwe ke senyegelwa ke dilo tlhe bathong please more especially mo fridgeng please its almost 2 dayy ke sena motlakase